AMIGO-900 Ophthalmic Lens Anti-Reflective Coating System
The AMIGO-900 Ophthalmic Lens AR Coating System is designed to meet the needs of both prescription lens workshops and large-scale lens production facilities.
It integrates advanced coating technologies and automated process control to ensure consistent quality, efficiency, and reliability.
Key Features
· Versatile Coating Capabilities
· High Productivity & Proven Reliability
· Consistent Quality
· Ease of Operation & Maintenance
· Integrated Process Control Software
· Flexible Model Design
· Stable Vacuum & Reliable Performance
· Comprehensive Service Support
Chamber size | Dia, 900~ 1350 (1500 -2500) |
Productivity | Approximately 28 to 250 pieces based on a 70mm lens (varies by model) |
Low vacuum pumping | Oil Rotary Pump + Mechanical Booster Pump |
High vacuum pumping | Turbo molecular pump or Oil diffusion pump |
Vapor Source | Electron Beam source, Deflection angle : 180° 0r 270° |
Ion Beam Source | End-Hall type |
Thin film deposition control | XTC/3S and Other |
CRYO Chiller | Typical Pumping Speed l/sec : 65,000 ~ 200,000 |
System operation controller | The AMIGO Control System provides retrieved automatic, manual or service modes of operation |
10H | 24H | ||||
AMIGO-900 | Category | Ø70 (10h) | Ø72 (10h) | Ø70 (24h) | Ø72 (24h) |
Single Dome Capacity | 51 pairs | 45 pairs | 51 pairs | 45 pairs | |
Cycle Time (A+B) | 54 min | 54 min | 54 min | 54 min | |
Daily Working Time (min) | 480 min | 480 min | 1,290 min | 1,290 min | |
Possible Cycles per Day | 9 | 9 | 24 | 24 | |
Daily Output (pairs) | 9 × 51 = 459 pairs | 9 × 45 = 405 pairs | 24 × 51 = 1,224 pairs | 24 × 45 = 1,080 pairs | |
Working Days per Month | 25 days | 25 days | 25 days | 25 days | |
Monthly Output (pairs) | 11,475 pairs | 10,125 pairs | 30,600 pairs | 27,000 pairs | |
10H | 24H | ||||
AMIGO-1350 | Category | Ø70 (10h) | Ø72 (10h) | Ø70 (24h) | Ø72 (24h) |
Single Dome Capacity | 124 pairs | 108 pairs | 124 pairs | 108 pairs | |
Cycle Time (A+B) | 50 min | 50 min | 50 min | 50 min | |
Daily Working Time (min) | 480 min | 480 min | 1,320 min | 1,320 min | |
Possible Cycles per Day | 10 | 10 | 26 | 26 | |
Daily Output (pairs) | 10 × 124 = 1,240 | 10 × 108 = 1,080 | 26 × 124 = 3,224 | 26 × 108 = 2,808 | |
Working Days per Month | 25 days | 25 days | 25 days | 25 days | |
Monthly Output (pairs) | 31,000 pairs | 27,000 pairs | 80,600 pairs | 70,200 pairs | |